The list of amounts of components, ingredients, and products compelled to develop a product is the

*
grasp schedule.

You are watching: The difference between a gross material requirements plan and a net requirements plan is that

bill-of-materials.
purchase order.
engineering readjust notification.

____________ allows a segment of the grasp schedule to be designated as "not to be rereserved."

*
Regenerative MRP
System nervousness
Pegging
Time fence

A lot-sizing strategy that generates specifically what was required to accomplish the setup is

*
the Wagner-Whitin algorithm.
component duration balancing.
lot-for-lot.
financial order quantity.

Breaking up the order and also running component of it ahead of schedule is well-known as

*
operations separating.
pegging.
overlapping.
lot splitting.

The distinction in between a gross product demands plan (gross MRP) and also a net product needs arrangement (net MRP) is

*
the gross MRP includes consideration of the inventory on hand also, whereas the net MRP does not.
the gross MRP might not be computerized, however the net MRP must be computerized.
the net MRP contains consideration of the inventory on hand, whereas the gross MRP does not.
the gross MRP does not take taxes right into account, whereas the net MRP includes the taxation considerations.

A phantom bill-of-materials is a bill-of-products developed for

*
the purpose of grouping subassemblies when we wish to issue "kits" for later on use.
a last product for which production is to be disongoing.
a subassembly that exists just temporarily.
a module that is a significant component of a final product.

Which of the following lot-sizing approaches is likely to prove the the majority of complicated to use?

*
economic order amount (EOQ)
the Wagner-Whitin algorithm
lot-for-lot
component duration balancing (PPB)

When a bill-of-materials is used in order to assign an man-made parent to a bill-of-materials, it is generally called a

*
pick list.
modular bill-of-products.
planning bill-of-materials.
phantom bill-of-materials.

The operations manager has actually a number of devices obtainable to resolve MRP mechanism nervousness. Those devices are

*
buckets with earlier flush.
time fences and pegging.
pseuexecute bills and kits.
net and gross needs.

An MRP system that provides feedago to the capacity arrangement, understand manufacturing schedule, and also manufacturing plans is called

*
lot-sizing.
closed-loop MRP.
mechanism nervousness.
load report.

A time-phased stock-replenishment setup for all levels of a supply chain is called

*
MRP.
MRP II.
ERP.
DRP.

Which of the following is an benefit of ERP?

*
requires significant alters to the agency and its processes
is simple sufficient that service providers have a simple time adjusting to it
creates commonality of databases
is exceptionally inexpensive to purchase

Use the product framework tree and also the inventory documents to identify just how many item Cs must be ordered in order to develop 20 phones.Item
On-Hand
A5
B5
C5
D25
E4
F20
*
97
120
115
105

Use the product framework tree and also the lead time indevelopment (in weeks) to recognize when an order for Fs should be put to deliver phones in week 10 if the phones need 2 weeks to assemble. Assume tbelow is no founding inventory for any kind of component or end item.Item
Lead Time
A2
B1
C3
D2
E3
F2
*
week 2
week 4
week 3
week 5

A(n) ________ system offers feedago to the capacity arrangement, master production schedule and also manufacturing plan.

*
Wagner-Whitin
closed-loop
effective consumer response
load

Which of these pieces of indevelopment is NOTincluded in a bill of material?

*
raw products to be used
lead times
physical dimensions
amounts of components

A report that reflects the reresource requirements in a job-related facility for all presently assigned work and all planned and intended orders is a

*
load report.
back flush report.
closed-loop report.

See more: Is Radio Masculine Or Feminine In Spanish, Is Radio A Masculine Or Feminine Noun

MRP II report.
The Submit Answers for Grading feature needs scripting to feature. Your internet browser either does not support scripting or you have actually turned scripting off.So, the Submit Answers for Grading switch below will not work-related.The following Submit Answers for Grading switch is gave in its area and also will certainly clear your answers: The Clear Answers and Start Over attribute calls for scripting to attribute. Your web browser either does not support scripting or you have turned scripting off. So, the Clear Answers and Start Over switch below will certainly not work. The following Clear Answers switch is gave in its place and also will certainly clear your answers:
Your internet browser either does not support scripting or you have turned scripting off. As such, the answer choices will certainly NOT show up in a various order each time the page is loaded, though that is stated below. Note that you execute not require this feature to usage this website. Answer selections in this exercise appear in a different order each time the page is loaded.
*